Installation of all 33 turbines has been completed at the Ruisi Wind Power Project in Shida Kartli, as the 206 MW facility moves toward grid connection and commissioning.
A proposed modification to the Kaspi wind project would increase its installed capacity by 26 MW and fully double-circuit the associated 110 kV transmission line.